Gas Cooking Range

Installation Service Fee

  • Gas Pipe Connection
    ~
  • (Towngas) Reinforced Hose Pipe with Switch
    30 in.
  • OR (LPG) Plastic Gas Tubing for Cylinder
    Within 6 ft
  • Gas Pipe Connection
    ~
  • (Towngas) Reinforced Hose Pipe with Switch
    30 in.
  • OR (LPG) Plastic Gas Tubing for Cylinder
    Within 6 ft

Additional Charges

Regional / Walk‐up Surcharge
Hong Kong, Kowloon & New Territories (Urban Regions)
~
Remote Areas: Tung Chung / Ma Wan
HK$200/visit
Remote Areas: New Territories (Non-urban Regions) / Other Areas in Lantau Island (e.g. Discovery Bay or Airport)
HK$600/visit
Remote Areas: Outlying Islands (e.g. Cheung Chau / Ping Chau / Lamma Island) & Other Restricted Regions
HK$600/visit
Walk-up Buildings (2 floors and up^) or Any Floor Not Accessible by Lift
HK$30/floor
^ 8 staircase steps = 1 floor
Special Service Fee
Site Survey
HK$100/visit
Same-day Delivery Surcharge*
HK$80/unit
Surcharge for On-site Parking
Full Reimbursement for Actual Parking Fee^
Removal & Disposal of Old Unit
From HK$150/unit
Enlargement of Countertop Opening Wood
HK$ 200
Artificial Stone
Cut-outs in Glass or Wall for Wiring
From HK$80/hole
* Purchased goods to be delivered by technician on the day of installation service
^ If customer will provide free parking space, technician must be notified in advance
Parts & Additions
Power Cord Extension (Single-phase) 2.5mm: From HK$ 23/ft
Stainless-Steel Panel (Over-size Countertop Opening) HK$1000 up
Power Switch Wiring HK$120
Wall Panel Coverage
Plastic Panel HK$200/pc
Stainless Steel HK$500/pc MCB Circuit Breaker

Remark

  • Separate quotation is required for other additional work not mentioned above
  • Additional work is to be paid by customer and completed by technician on the same day
  • Additional work to be commenced on a different day will require separate quotation
  • Quotation for additional work will be provided by technician on site